LAB · Visualisation and development

Assess the direction before production

We visualise the proposal and define what needs technical or physical validation before moving forward.

Swipe through all four

Autumn moodboard: whitewashed stone, olive tree, fireplace, cove, knitwear and wool in earth tones
Collection direction
Development sheet for the KN01 V-neck knitted jumper: views, details, construction and colours
Design and development
Detail of cream knitwear: texture and rib in the evening light
Samples and production
Autumn editorial: long coat and wide trousers in cream, stone terrace above the sea
Editorial, campaign and space

What we work on

Collection direction

Moodboards, colour palettes, materials and design criteria grounded in identity.

Design and development

Silhouettes, proportions and details for comparing options and defining the proposal.

Technical documentation

Product specifications, measurements, materials, construction and finishes according to scope.

Samples and production

Sample reviews, fitting and approval criteria when the project includes technical development and production follow-up.

Editorial, campaign and space

Visual applications that help assess whether product and expression follow the same direction.

What the team receives

The agreed proposals and documents, identifying approved decisions, limits and outstanding checks.

An image helps assess direction. Fit, material behaviour and quality require specific tests.

Production documentation

Information sent to suppliers is limited to what they need to quote and manufacture. Commercial criteria and internal information are managed separately.

How execution is organised

With production follow-up

We coordinate development and the agreed reviews with the project’s teams and suppliers.

With technical handover

The brand executes with its own team and suppliers using the documentation and criteria provided.

Responsibilities are defined in the scope of work.

How we assess progress

We review decisions resolved before sampling, correction rounds and the reasons for changes. Costs and timings are compared only where scopes are equivalent.